The ITER EC H&CD upper launcher: Design, analysis and testing of a bolted joint for the Blanket Shield Module
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
The ITER EC H&CD upper launcher: Design, analysis and testing of a bolted joint for the Blanket Shield Module
چکیده انگلیسی
► The BSM of the ECH Launcher is attached to the Launcher Main Frame by a bolted joint. ► The bolts were designed as “captive” in order to avoid their accidental removal from the joint. ► The bolted flange connection using two sets of 15 captive bolts (M22 × 2) placed along the sides. ► The captive bolt design is based on a concept that uses a dedicated spring ring, a standard spiral spring and a tensioning screw with two threads to secure the bolts in a form-locking stop.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 88, Issues 9–10, October 2013, Pages 1881-1885