Tramo desmontable del Puente de la Constitución de 1812 sobre la Bahía de Cádiz
ترجمه فارسی عنوان
بخش قابل جابجایی پل قانون اساسی سال 1812 در خلیج قدیس
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
چکیده انگلیسی
A simply supported 150 m long deck was built on the Cadiz Bay Bridge on the part that runs over the sea. It weighs about 4,000 t, and has the possibility of being removed to make a way through the bridge, and allow the navigation of large floating structures that exceed the vertical clearance of 69.00 m, which is what is available in the main navigation channel in the centre of the main span. This article describes the removable span and the special operations carried out for its installation. Within the complexity of these manoeuvres, the following can be highlighted: the transfer of the bridge deck from the dock to the floating barge, the positioning of the deck between piers, and the lifting operation to their final supports on the piers head.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Hormigón y Acero - Volume 67, Issues 278–279, January–August 2016, Pages 209-219