کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
6758537 | 1431384 | 2018 | 12 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Improvement of plant reliability based on combination of prediction and inspection of wall thinning due to FAC
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
Reliability-centered maintenanceBWRMTCFMEAECPRPNTBMPrimary water stress corrosion crackingNPPSSCFPPIGSCCHCFCBMFACRCMPWSCCSCCFIAsRBIPWRV&V - V و VAcoustic emission testing - آزمون انتشار آکوستیکRisk evaluation - ارزیابی ریسکInspection - بازرسیRisk-based inspection - بازرسی بر اساس ریسکVerification and validation - تأیید و اعتبارUncertainty analysis - تجزیه و تحلیل عدم قطعیتIntergranular stress corrosion cracking - ترک خوردگی خوردگی تنش بین گرانولUltrasonic testing - تست التراسونیکPenetration testing - تست نفوذCondition-based maintenance - تعمیر و نگهداری مبتنی بر شرایطAlternating current - جریان متناوبDirect Current - جریان مستقیمFailure mode and effect analysis - حالت شکست و تجزیه و تحلیل اثرCorrosion fatigue - خستگی خوردگیHigh Cycle Fatigue - خستگی چرخه بالاStress corrosion cracking - خوردگی تنشیflow-accelerated corrosion - خوردگی جریان شتاب دهندهCFD - دینامیک سیالاتComputational fluid dynamics - دینامیک سیالات محاسباتیBoiling water reactor - رآکتور آب جوشPressurized Water Reactor - راکتور آب تحت فشارRBM - سربازیRisk Priority Number - شماره اولویت خطرMass transfer coefficient - ضریب انتقال جرمStainless steel - فولاد ضد زنگCarbon steel - فولاد کربنی یا فولاد کربن استیلRisk-based maintenance - نگهداری بر اساس ریسکnuclear power plant - نیروگاه هستهایPrediction - پیش بینی
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
چکیده انگلیسی
Improvement of plant reliability based on reliability-centered-maintenance (RCM) is going to be undertaken in nuclear power plants (NPPs). RCM is supported by three types of maintenances: risk-based maintenance (RBM); time-based maintenance (TBM); and condition-based maintenance (CBM). RBM is supported by suitable combinations of prediction, inspection and maintenance of elemental defects in stages of their propagations. Especially the combination of prediction and inspection is one of the key issues to promote RBM. As an example of RBM, the fusion of the prediction and inspection related to wall thinning due to flow-accelerated corrosion (FAC) has been introduced. Early prediction of FAC occurrence and its propagation should be confirmed throughout the entire plant systems which should be accomplished by inspections at the target locations followed by timely application of suitable countermeasures such as water chemistry improvements. At the same time, transparency and traceability as well as accuracy are strongly required for the prediction. A one dimensional FAC code based on analysis of materials and water interaction was applied for evaluation of FAC risk as well as FAC occurrence and propagation. The details of FAC mechanism have been reported along with the expected accuracy of prediction to prepare for ensuring their transparency and traceability. Based on prediction results, primary points for inspections will be determined. Unfortunately, it is still difficult to evaluate some key parameters in the plants, e.g., local flow turbulence. From the inspections, accumulated data will be applied to confirm the accuracy of the code, to tune some uncertainties of the key data for prediction, and then, to increase their accuracy. The synergetic effects of prediction and inspection on application of effective and suitable countermeasures are expected. In the paper, the procedures for the combination of prediction and inspection are introduced.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 337, October 2018, Pages 84-95
Journal: Nuclear Engineering and Design - Volume 337, October 2018, Pages 84-95
نویسندگان
Shunsuke Uchida, Hidetoshi Okada, Masanori Naitoh, Masayoshi Kojima, Hiroshige Kikura, Derek H. Liste,