کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
698241 890399 2008 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Medium term scheduling of a hydro-thermal system using stochastic model predictive control
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی کنترل و سیستم های مهندسی
پیش نمایش صفحه اول مقاله
Medium term scheduling of a hydro-thermal system using stochastic model predictive control
چکیده انگلیسی

A multistage stochastic programming formulation is presented for monthly production planning of a hydro-thermal system. Stochasticity from variations in water reservoir inflows and fluctuations in demand of electric energy are considered explicitly. The problem can be solved efficiently via Nested Benders Decomposition. The solution is implemented in a model predictive control setup and performance of this control technique is demonstrated in simulations. Tuning parameters, such as prediction horizon and shape of the stochastic programming tree are identified and their effects are analyzed.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automatica - Volume 44, Issue 6, June 2008, Pages 1585–1594
نویسندگان
, , ,