• The insulation resistances of an Italian high-speed railway concrete viaduct are investigated during its construction.
• The insulation resistance measurements are made in three sections of different characteristics of the viaduct “Ticino”.
• Six sessions of measurements in a period of two and a half year were carried out.
• The measured insulation resistances show a variation in time, which is related to the progress in viaduct completion.
• The main requirements for the protective provisions for both low- and high-speed railway lines are detailed.
An investigation into the insulation resistances of the concrete structures of a high-speed rail transit system viaduct is presented in this paper. Measurements of the insulation resistances in three sections of different characteristics are carried out during the construction stages of the viaduct, in order to get insights into the relation between insulation resistance changes and viaduct completion. The measurement campaign consists of six sessions of measurement in a period of two and a half years. The measured insulation resistances between a span and its supporting piers and between two adjacent spans show a variation in time and among the viaduct sections. The dispersion of the measurements in the three viaduct sections is highly reduced in the last session of measurements, showing that the insulation resistances are related to the progress in viaduct completion and the characteristics of viaduct sections. The main requirements for protective provisions for both low- and high-speed lines are also detailed.
Journal: Electric Power Systems Research - Volume 103, October 2013, Pages 241–247