کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
704292 891239 2008 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Sequential time-step generation companies decisions in oligopolistic electricity market
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Sequential time-step generation companies decisions in oligopolistic electricity market
چکیده انگلیسی

This paper studies the production decisions of generation companies (GENCOs) which are fully engaged in oligopolistic electricity markets. The model presented is based upon the static equilibrium model solved sequentially in time. By decomposing the problem in time, each time-step is solved independently using a Cournot-like market model. The time dimension is divided into discrete, 1-h time-steps. The model also incorporates the effects of technical and temporal constraints such as time on/off and ramp up/down. Since GENCOs tend toward repetitive decision-making, they can more easily learn from the market. The concept of forward expectations and the lessons derived from the market are introduced, and several numerical examples are provided.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 78, Issue 5, May 2008, Pages 824–834
نویسندگان
,