کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
7404443 1481298 2013 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A barrier analysis for the development of distributed energy in China: A case study in Fujian province
ترجمه فارسی عنوان
تجزیه و تحلیل مانع برای توسعه انرژی توزیع شده در چین: مطالعه موردی در استان فوجیان
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
چکیده انگلیسی
Distributed energy (DE) is receiving lots of attention from the Chinese government. A number of DE projects have been constructed in China. However, there are still numerous problems with DE projects. What hinders the development of DE in China? The Huadian Jimei distributed energy project (HJDE) is a typical DE building project that was not completed successfully. This paper focuses on this DE project to explore the barriers to DE development. The research group conducted 13 semi-structured interviews with representatives of institutions and corporations involved in the HJDE project to collect information. Based on the information, three types of problems were determined, and the results indicate that these conflicts between the core stakeholders make DE projects unsuccessful. These problems result from institutional barriers to DE, rooting in the development policy and the current energy market. Moreover, several key stakeholders are not able to play an active role in the design or management of DE projects. The Chinese government will put a much greater effort into the development of future DE projects. Many national support policies and rules will be announced, which are easy to practical use. Under these conditions, 1000 DE projects will be successfully completed until 2015.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Policy - Volume 60, September 2013, Pages 262-271
نویسندگان
, , , , ,