کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
9857889 | 1528149 | 2005 | 4 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Status of the NEMO project
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
فیزیک و نجوم
فیزیک هسته ای و انرژی بالا
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
Activities leading to the realization of a km3 Cherenkov neutrino detector, carried out by the NEMO collaboration, are described. Long term exploration of a 3500 m deep site in the Mediterranean close to the Sicilian coast has shown that it is optimal for the installation of the detector. A complete feasibility study, which has considered all the components of the detector, as well as its deployment, has been carried out demonstrating that technological solutions exist for the realization of the km3 detector. The realization of a technological demonstrator (the NEMO Phase 1 project) is under way.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Physics B - Proceedings Supplements - Volume 138, January 2005, Pages 191-194
Journal: Nuclear Physics B - Proceedings Supplements - Volume 138, January 2005, Pages 191-194
نویسندگان
Paolo Piattelli, the NEMO collaboration the NEMO collaboration,