کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1065238 | 1485855 | 2012 | 13 صفحه PDF | دانلود رایگان |
This study compared the use of public–private partnership (PPP) policy between high speed rail (HSR) projects and general infrastructure projects. Based on extensive literature reviews, drivers for adopting PPP strategy, critical success factors, and preferred risk factor allocation were collected to design a structural questionnaire for professionals in Taiwan and to elicit their PPP project experience. Analytical findings reveal that most experience learnt from general infrastructure projects is applicable in HSR projects after proper modification. This study provides a valuable reference for stakeholders interested in executing HSR via PPP.
► Governments are eager to attract private capital for infrastructure development.
► This study aims to determine the major contributing factors in PPP project success.
► Critical factors and preferred risk factor allocation were collected from experts.
► Analysis reveals that factors in PPP project success are applicable in HSR projects.
► This study provides a valuable reference in executing HSR via PPP.
Journal: Transport Policy - Volume 22, July 2012, Pages 36–48