کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1065238 1485855 2012 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects
موضوعات مرتبط
علوم انسانی و اجتماعی علوم اجتماعی جغرافیا، برنامه ریزی و توسعه
پیش نمایش صفحه اول مقاله
Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects
چکیده انگلیسی

This study compared the use of public–private partnership (PPP) policy between high speed rail (HSR) projects and general infrastructure projects. Based on extensive literature reviews, drivers for adopting PPP strategy, critical success factors, and preferred risk factor allocation were collected to design a structural questionnaire for professionals in Taiwan and to elicit their PPP project experience. Analytical findings reveal that most experience learnt from general infrastructure projects is applicable in HSR projects after proper modification. This study provides a valuable reference for stakeholders interested in executing HSR via PPP.


► Governments are eager to attract private capital for infrastructure development.
► This study aims to determine the major contributing factors in PPP project success.
► Critical factors and preferred risk factor allocation were collected from experts.
► Analysis reveals that factors in PPP project success are applicable in HSR projects.
► This study provides a valuable reference in executing HSR via PPP.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Transport Policy - Volume 22, July 2012, Pages 36–48
نویسندگان
, , , ,