کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1707166 1012509 2007 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation
چکیده انگلیسی

In this paper, we analyze the manufacturing lead time in a production system with BMAP (Batch Markovian Arrival process) input and post-operation operated under the N-policy. We use the factorization principle to derive the waiting time distribution (hence the manufacturing lead time) and the mean performance measures. A numerical example is provided.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematical Modelling - Volume 31, Issue 10, October 2007, Pages 2160–2171
نویسندگان
, , ,