کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
173709 458607 2008 22 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A tighter continuous time formulation for the cyclic scheduling of a mixed plant
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی مهندسی شیمی (عمومی)
پیش نمایش صفحه اول مقاله
A tighter continuous time formulation for the cyclic scheduling of a mixed plant
چکیده انگلیسی

In this paper, based on the cyclic scheduling formulation of Schilling and Pantelides [Schilling, G., & Pantelides, C. (1999). Optimal periodic scheduling of multipurpose plants. Computers& Chemical Engineering, 23, 635–655], we propose a continuous time mixed integer linear programming (MILP) formulation for the cyclic scheduling of a mixed plant, i.e. a plant composed of batch and continuous tasks. The cycle duration is a variable of the model and the objective is to maximize productivity. By using strengthening techniques and the analysis of small polytopes related to the problem formulation, we strengthen the initial formulation by tightening some initial constraints and by adding valid inequalities. We show that this strengthened formulation is able to solve moderate size problems quicker than the initial one. However, for real size cases, it remains difficult to obtain the optimal solution of the scheduling problem quickly. Therefore, we introduce MILP-based heuristic methods in order to solve these larger instances, and show that they can provide good feasible solutions quickly.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Chemical Engineering - Volume 32, Issue 11, 24 November 2008, Pages 2723–2744
نویسندگان
, ,