کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
588545 878580 2011 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A note on an extended fuzzy bi-level optimization approach for water exchange in eco-industrial parks with hub topology
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی بهداشت و امنیت شیمی
پیش نمایش صفحه اول مقاله
A note on an extended fuzzy bi-level optimization approach for water exchange in eco-industrial parks with hub topology
چکیده انگلیسی

In our previous paper, a fuzzy bi-level programming model was developed to determine optimal interplant water integration networks in eco-industrial parks (EIPs). This approach allowed the appropriate incentive mechanisms, in the form of fresh water and effluent fees as well as water reuse subsidies, to be optimized from the perspective of the EIP authority. This work extends the original mathematical model by modifying the role of the EIP authority to include water regeneration and redistribution via a centralized hub. The resulting fuzzy bi-level programming model may then be solved to yield a “satisficing” solution that reflects a reasonable compromise between the EIP authority's desire to minimize fresh water usage, and the participating companies’ desire to minimize costs. A case study is used to illustrate the modeling approach.

Research highlights▶ A novel bi-level optimization model for designing water exchange networks in eco-industrial parks (EIPs) was developed. ▶ The model focuses on EIPs with hub topology where stream exchanges among companies are done through a centralized facility. ▶ The bi-level optimization approach accounts for the interactions between the EIP authority and the participating companies using a Stackelberg game framework.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Process Safety and Environmental Protection - Volume 89, Issue 2, March 2011, Pages 106–111
نویسندگان
, , , ,