کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
686703 889110 2006 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Long term diurnal variations in contaminant removal in high rate ponds treating urban wastewater
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی تکنولوژی و شیمی فرآیندی
پیش نمایش صفحه اول مقاله
Long term diurnal variations in contaminant removal in high rate ponds treating urban wastewater
چکیده انگلیسی

In this investigation, diurnal variations in contaminant removal in high rate ponds (HRP) treating urban wastewater were evaluated. Two experimental HRPs (surface area 1.54 m2 and depth 0.3 m), each with a clarifier in series (surface area 0.025 m2), were operated in parallel with different hydraulic retention times (3–10 days) but with the same environmental conditions over a period of one year. The operating strategies adopted only yielded a significant overall difference in removal between the two HRPs for nutrients. Effluent total suspended solids and chemical oxygen demand were slightly higher at midday than at dawn, while for total nitrogen and total phosphorous the concentrations were slightly higher at dawn. All these differences were related to the diurnal changes of DO and pH. The main conclusion of this work is that the diurnal variations of the contaminant concentrations in HRPs do not seriously affect their reliability in treating wastewater.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Bioresource Technology - Volume 97, Issue 14, September 2006, Pages 1709–1715
نویسندگان
, , , , , ,