کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
704022 891187 2011 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Optimal hoist scheduling of a deep level mine twin rock winder system for demand side management
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Optimal hoist scheduling of a deep level mine twin rock winder system for demand side management
چکیده انگلیسی

This paper presents a near optimal hoist scheduling and control program for rock winders found in South African deep level mines in the context of demand side management and time-of-use (TOU) tariffs. The objective is to achieve a set hoist target at minimum energy cost within various system constraints. The development of a discrete dynamic and constrained mixed integer linear programming model for a twin rock winder system is presented on which a half-hourly model predictive control (MPC) algorithm containing an adapted branch and bound methodology is applied for near optimal scheduling. Simulation results illustrate the effectiveness of the control program by minimising the energy costs through scheduling according to the TOU tariff and controlling output and ore levels within their boundaries even in the case of significant random delays in the system. Scheduling according to the TOU tariff shows a possible 30.8% reduction in energy cost while approximately 6 h of delays in the system resulted in a mere 14% increase in energy cost.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 81, Issue 5, May 2011, Pages 1088–1095
نویسندگان
, , ,