کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
8870412 | 1622617 | 2017 | 15 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Refuse Derived Fuel (RDF) production and gasification in a pilot plant integrated with an Otto cycle ICE through Aspen plus⢠modelling: Thermodynamic and economic viability
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
علوم زمین و سیارات
مهندسی ژئوتکنیک و زمین شناسی مهندسی
پیش نمایش صفحه اول مقاله
![عکس صفحه اول مقاله: Refuse Derived Fuel (RDF) production and gasification in a pilot plant integrated with an Otto cycle ICE through Aspen plus⢠modelling: Thermodynamic and economic viability Refuse Derived Fuel (RDF) production and gasification in a pilot plant integrated with an Otto cycle ICE through Aspen plus⢠modelling: Thermodynamic and economic viability](/preview/png/8870412.png)
چکیده انگلیسی
This work deals with the development of a Refuse Derived Fuel (RDF) gasification pilot plant using air as a gasification agent. A downdraft fixed bed reactor is integrated with an Otto cycle Internal Combustion Engine (ICE). Modelling was carried out using the Aspen Plus⢠software to predict the ideal operational conditions for maximum efficiency. Thermodynamics package used in the simulation comprised the Non-Random Two-Liquid (NRTL) model and the Hayden-O'Connell (HOC) equation of state. As expected, the results indicated that the Equivalence Ratio (ER) has a direct influence over the gasification temperature and the composition of the Raw Produced Gas (RPG), and effects of ER over the Lower Heating Value (LHV) and Cold Gasification Efficiency (CGE) of the RPG are also discussed. A maximum CGE efficiency of 57-60% was reached for ER values between 0.25 and 0.3, also an average reactor temperature values in the range of 680-700 °C, with a peak LHV of 5.8 MJ/Nm3. RPG was burned in an ICE, reaching an electrical power of 50 kWel. The economic assessment of the pilot plant implementation was also performed, showing the project is feasible, with power above 120 kWel with an initial investment of approximately US$ 300,000.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Waste Management - Volume 69, November 2017, Pages 187-201
Journal: Waste Management - Volume 69, November 2017, Pages 187-201
نویسندگان
Albany Milena Lozano Násner, Electo Eduardo Silva Lora, José Carlos Escobar Palacio, Mateus Henrique Rocha, Julian Camilo Restrepo, Osvaldo José Venturini, Albert Ratner,