
Targeting the optimum steam system for power generation with increased flexibility in the steam power island design
Keywords: فشار بالا; Pinch analysis; Utility system modeling; Steam system optimization; Power generation; Total site analysis; IGCC with CCS; HEN; heat exchanger network; TSA; total site analysis; HP; high pressure; IP; intermediate pressure; LP; low pressure; HRSG; heat rec