کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
10296514 534197 2005 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Causes, impact and control of overbreak in underground excavations
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
پیش نمایش صفحه اول مقاله
Causes, impact and control of overbreak in underground excavations
چکیده انگلیسی
In order to understand the mysterious nature of blast damage prediction and control, the field work involved the small scale blasting of physical models and the assessment of blast damage during drifting operations. The damage was measured by the Half cast factor, percentage overbreak and the Blast damage index. The influence of rock mass features, explosive characteristics and blast design parameters on overbreak has been examined in this study. A new approach for the judicious design of perimeter hole pattern and charge concentration has been proposed. Implications of blast damage have also been outlined in this paper.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Tunnelling and Underground Space Technology - Volume 20, Issue 1, January 2005, Pages 63-71
نویسندگان
, ,