کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
10296827 | 534403 | 2005 | 7 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Tunnelling through an embankment using all ground fasten method
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
علوم زمین و سیارات
مهندسی ژئوتکنیک و زمین شناسی مهندسی
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
The Tohoku Shinkansen Railway between Morioka and Hachinoe was opened on December 1, 2002. In this section, there are 20 tunnels. Second Itsukaichi tunnel is one of them, and it is a relatively short tunnel of 1175 m. At the Morioka portal, this tunnel crosses under National Highway No. 4 with a small depth of overburden 2-5 m where approximately 15,000 vehicles pass a day. The tunnel was excavated by NATM method. All Ground Fasten method was used as an auxiliary method. As a result, the face was prevented from collapsing and the tunnel was excavated while keeping the ground surface settlement to a minimum without interfering with road traffic.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Tunnelling and Underground Space Technology - Volume 20, Issue 2, March 2005, Pages 121-127
Journal: Tunnelling and Underground Space Technology - Volume 20, Issue 2, March 2005, Pages 121-127
نویسندگان
Makoto Miwa, Mitsumasa Ogasawara,