Changing vessel routes could significantly reduce the cost of future offshore wind projects
ترجمه فارسی عنوان
تغییر مسیرهای کشتی می تواند به طور قابل توجهی کاهش هزینه های آینده پروژه های دریایی دریای خزر را کاهش دهد
کلمات کلیدی
انرژی باد ساحلی، تجزیه و تحلیل هزینه و اثربخشی، حمل و نقل دریایی، برنامه ریزی فضایی دریایی، تغییر مسیر کشتی
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
چکیده انگلیسی


• We use CEA as a decision tool for CMSP to assess the effects of vessel rerouting.
• Vessel rerouting allows development of wind projects closer to shore.
• Less than 1500 vessel transits are rerouted by an average of 18.5 km per trip.
• The cost savings of the proposed policy are approximately $13.4 billion (in 2012$).
• The proposed policy can help support wind energy development in the US.

With the recent emphasis on offshore wind energy Coastal and Marine Spatial Planning (CMSP) has become one of the main frameworks used to plan and manage the increasingly complex web of ocean and coastal uses. As wind development becomes more prevalent, existing users of the ocean space, such as commercial shippers, will be compelled to share their historically open-access waters with these projects. Here, we demonstrate the utility of using cost-effectiveness analysis (CEA) to support siting decisions within a CMSP framework. In this study, we assume that large-scale offshore wind development will take place in the US Mid-Atlantic within the next decades. We then evaluate whether building projects nearshore or far from shore would be more cost-effective. Building projects nearshore is assumed to require rerouting of the commercial vessel traffic traveling between the US Mid-Atlantic ports by an average of 18.5 km per trip. We focus on less than 1500 transits by large deep-draft vessels. We estimate that over 29 years of the study, commercial shippers would incur an additional $0.2 billion (in 2012$) in direct and indirect costs. Building wind projects closer to shore where vessels used to transit would generate approximately $13.4 billion (in 2012$) in savings. Considering the large cost savings, modifying areas where vessels transit needs to be included in the portfolio of policies used to support the growth of the offshore wind industry in the US.