کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1703215 1012368 2014 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Single machine common flow allowance scheduling with deteriorating jobs and a rate-modifying activity
ترجمه فارسی عنوان
برنامه ریزی مجدد جریان مشترک تنها با مشاغل خراب و فعالیت تغییر دهنده سرعت
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
چکیده انگلیسی

We study a single machine slack due date assignment (usually referred to as SLK) scheduling problem with deteriorating jobs and a rate-modifying activity. The deterioration effect manifest such that the job processing time is a function of its starting time in a sequence. The rate-modifying activity is an activity that changes the processing rate of machine, i.e., the machine performs a rate-modifying activity. Hence the actual processing time of a job is a variable, which depends not only on its starting time in a sequence but also on whether it is scheduled before or after a rate-modifying activity. The goal is to schedule the rate-modifying activity, the optimal common flow allowance and the sequence of jobs to minimize the total earliness, the total tardiness and the common flow allowance cost. We show that the problem remains polynomially solvable under the proposed model.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematical Modelling - Volume 38, Issue 23, 1 December 2014, Pages 5431–5438
نویسندگان
, , , ,