کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1703552 1012383 2014 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: A graph-theoretic view
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: A graph-theoretic view
چکیده انگلیسی

The present study attempts to synchronize the scheduling problem with determining the advanced available-to-promise (AATP) in a flowshop system to enhance supplier profitability and service level. In the proposed model the AATP, scheduling and graph theory concept have been combined to find the optimum resource allocation and enable accurate estimations of machines scheduling, production costs and delivery dates. To find the near optimum solutions for the large size problems a genetic algorithm is developed, first the orders are ranked based on their scores which are estimated then the optimum cost is calculated by balancing profitability and constraints such as the availability of the machines or the available material in each workstation. Some computer simulated experiments are provided to evaluate the performance of the proposed algorithm.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematical Modelling - Volume 38, Issue 24, 15 December 2014, Pages 6098–6107
نویسندگان
, , ,