کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1703891 1519413 2014 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
چکیده انگلیسی

This study explores the economic production quantity model with scrap, rework and stochastic machine breakdown. The main purpose of this paper is twofold:(P1) This paper will adopt the rigorous methods of mathematics to demonstrate that the expected total cost per unit time is convex on all positive numbers to improve the conditional convexity in Theorem 1 of Chiu et al. (2010) [7].(P2) This paper gives the concrete proof to provide bounds for the optimal production run time to remove the logical shortcomings of mathematics presented in proof of Theorem 2 of Chiu et al. (2010) [7].

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematical Modelling - Volume 38, Issues 7–8, 1 April 2014, Pages 2296–2301
نویسندگان
, ,