کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1705488 1012433 2013 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A just-in-time three-level integrated manufacturing system for linearly time-varying demand process
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
پیش نمایش صفحه اول مقاله
A just-in-time three-level integrated manufacturing system for linearly time-varying demand process
چکیده انگلیسی

This paper considers a just-in-time (JIT) manufacturing system in which a single manufacturer procures raw materials from a single supplier, process them to produce finished products, and then deliver the products to a single-buyer. The customer demand rate is assumed to be linearly decreasing time-varying. In the JIT system, in order to minimize the suppliers as well as the buyers holding costs, the supply of raw materials and the delivery of finished products are made in small quantities. In this case, both the supply and the delivery may require multiple installments for a single production lot. We develop a mathematical model for this problem, propose a simple methodology for solving the model, and illustrate the effectiveness of the method with numerical examples.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematical Modelling - Volume 37, Issue 3, 1 February 2013, Pages 1275–1281
نویسندگان
, , ,