کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
4481958 | 1316844 | 2012 | 13 صفحه PDF | دانلود رایگان |
Biodiversity recovery measures have often been ignored when dealing with the restoration of degraded aquatic systems. Furthermore, biological valuation methods have been applied only spatially in previous studies, and not jointly on a temporal and spatial scale. The intense monitoring efforts carried out in a highly polluted estuary, in northern Spain (Nervión estuary), allowed for the economic valuation of the costs and the biological valuation of the benefits associated with a 21 years sewage scheme application. The analysis show that the total amount of money invested into the sewage scheme has contributed to the estuary’s improvement of both environmental and biological features, as well as to an increase in the uses and services provided by the estuary. However, the inner and outer parts of the estuary showed different responses. An understanding of the costs and trajectories of the environmental recovery of degraded aquatic systems is increasingly necessary to allow policy makers and regulators to formulate robust, cost-efficient and feasible management decisions.
Figure optionsDownload high-quality image (62 K)Download as PowerPoint slideHighlights
► Biodiversity restoration valuation as a measure of the recovery of a polluted estuary.
► We established cost-benefit links between restoration investment, abiotic and biotic recovery.
► The cost-benefit analysis of the abatement actions can assist decision-makers with management.
Journal: Water Research - Volume 46, Issue 1, 1 January 2012, Pages 205–217