کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6783841 533336 2015 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Challenges and strategies involved in designing and constructing a 6 km immersed tunnel: A case study of the Hong Kong-Zhuhai-Macao Bridge
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
پیش نمایش صفحه اول مقاله
Challenges and strategies involved in designing and constructing a 6 km immersed tunnel: A case study of the Hong Kong-Zhuhai-Macao Bridge
چکیده انگلیسی
A 6 km immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge (HZMB) has been designed and funded. Once completed in 2016, the HZMB Tunnel will break the record of the 5.8 km BART Tunnel in the United States, although it will soon be overtaken by the ∼20 km Fehmarn Tunnel between Denmark and Germany that is to be completed in 2020. Construction of the HZMB Tunnel was started in 2011 and more than ten elements thus far have been installed on the site. This paper presents details about the challenges and solutions for the design and construction of the HZMB Tunnel on a strategic level. Special features of the HZMB Tunnel include a long length of 6 km, a deep water depth of almost 45 m, and a thick backfill of 23 m. Challenges include severe marine environment, strict requirements for waterproofing, construction of sections connecting the tunnel with artificial islands, and tunnel stability after future excavation of fairway trenches. Moreover, the HZMB Tunnel is challenged by possible sand liquefaction in seismic events, conservation of white Chinese dolphin, and waterway dispersion during construction. Details about the strategies are given in order to improve the immersed tunnel design and construction methods.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Tunnelling and Underground Space Technology - Volume 50, August 2015, Pages 171-177
نویسندگان
, , ,