کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6784027 533336 2015 14 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A retrospective evaluation of the performance of liner systems used to rehabilitate municipal gravity sewers
ترجمه فارسی عنوان
ارزیابی گذشته نگری از عملکرد سیستم های خطی استفاده شده برای بازسازی فاضلاب های گرانشی شهری
کلمات کلیدی
فاضلاب توانبخشی، پوشش ارزیابی وضعیت، آزمایش کردن، ارزیابی چرخه زندگی،
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
چکیده انگلیسی
This paper provides new results gathered as part of a 6-year project funded by the U.S. Environmental Protection Agency (USEPA) to document the in-service performance of trenchless pipe rehabilitation techniques. The results from a pilot study focusing on cured-in-place pipe (CIPP) rehabilitation technologies were previously reported and the research program was extended to allow collection of additional CIPP samples and also to extend the study to other rehabilitation technologies (specifically included in this Phase 2 research were fold-and-form, deform-reform, and sliplining technologies). The establishment of a database to house performance evaluation data for rehabilitation technologies used in the water and wastewater sectors is also described. The additional retrospective data for CIPP and other rehabilitation technologies are reported and an overall assessment of CIPP life cycle performance is provided. The examination of CIPP liners with up to 34 years in service and other rehabilitation technologies with up to 19 years of service has shown that all of the rehabilitation technologies are showing little evidence of deterioration in service. The test results for 18 CIPP samples from nine cities across North America indicate that properly designed and installed CIPP liners should meet and likely exceed the typical 50-year expected design life. For the fold-and-form, deform-reform, and sliplining technologies, there are only two to three samples per rehabilitation technology and hence less can be said about overall performance. Nevertheless, all of the samples tested still met the material property requirements at installations after 14-19 years of service. In summary, the results provide an excellent prognosis for the rehabilitation technologies evaluated.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Tunnelling and Underground Space Technology - Volume 50, August 2015, Pages 451-464
نویسندگان
, , , , , , ,