کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1066090 948671 2011 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Life cycle greenhouse gas assessment of infrastructure construction for California’s high-speed rail system
موضوعات مرتبط
علوم زیستی و بیوفناوری علوم محیط زیست علوم زیست محیطی (عمومی)
پیش نمایش صفحه اول مقاله
Life cycle greenhouse gas assessment of infrastructure construction for California’s high-speed rail system
چکیده انگلیسی

This study estimates of the life cycle greenhouse gas inventory for construction of high-speed rail infrastructure from San Francisco to Anaheim indicates it will result in 2.4 million metric tons of CO2 with material production comprising 80% of emissions and transportation of construction materials, 16%. While tunneling and aerial structures account for only 15% of the route’s length, they are responsible for 60% of emissions. Based on estimates of avoided emissions from operation of the system of just over one million metric tons of CO2 per year, construction emissions would be recuperated in about two years and their global warming effect in about six after services begin. This range of recuperation times is relatively short given the long-life of the constructed infrastructure. Avoided emissions estimates are dependent on ridership and if low ridership lead to a 75% decrease in offset emissions, recuperation times may increase to more than 20 years.


► We model life cycle GHG emissions from construction of a proposed high-speed rail.
► Construction of a high-speed rail link will emit approximately 3200 t CO2e per km.
► The climate change effect of construction will be offset after 6 years of operation.
► Construction material production contributes 80% of GHG emissions.
► Tunnels and aerial structures are 15% of the network but contribute 60% of emissions.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Transportation Research Part D: Transport and Environment - Volume 16, Issue 6, August 2011, Pages 429–434
نویسندگان
, ,