Group-shop scheduling with sequence-dependent set-up and transportation times
ترجمه فارسی عنوان
برنامه ریزی گروه بندی با زمان بندی های مرتبط با دنباله و زمان حمل و نقل
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
چکیده انگلیسی

This paper considers a group-shop scheduling problem (GSSP) with sequence-dependent set-up times (SDSTs) and transportation times. The GSSP provides a general formulation including the job-shop and the open-shop scheduling problems. The consideration of set-up and transportation times is among the most realistic assumptions made in the field of scheduling. In this paper, we study the GSSP with transportation and anticipatory SDSTs, where jobs are released at different times and there are several transporters to carry jobs. The objective is to find a job schedule that minimizes the makespan, that is, the time at which all jobs are completed and transported to the warehouse (or to the customer). The problem is formulated as a disjunctive programming problem and then prepared in a form of mixed integer linear programming (MILP). Due to the non-deterministic polynomial-time hardness (NP-hardness) of the GSSP, large instances cannot be optimally solved in a reasonable amount of time. Therefore, a genetic algorithm (GA) hybridized with an active schedule generator is proposed to tackle large-sized instances. Both Baldwinian and Lamarckian versions of the proposed hybrid algorithm are then implemented and evaluated through computational experiments.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematical Modelling - Volume 38, Issues 21–22, 1 November 2014, Pages 5080–5091
نویسندگان
, ,