کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6367699 1316853 2013 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Impact of treatment on Pb release from full and partially replaced harvested Lead Service Lines (LSLs)
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات فرآیندهای سطح زمین
پیش نمایش صفحه اول مقاله
Impact of treatment on Pb release from full and partially replaced harvested Lead Service Lines (LSLs)
چکیده انگلیسی

Release of lead from 80% partially replaced service lines was compared to full lead service lines using harvested-stabilized lead pipes and field brass connectors. After more than a year of stabilization, lead release was consistent with field samples. Over the relatively short duration partial replacement of lead pipe by copper pipe (3 months), generated high lead release, attributed to galvanic corrosion, resulting in a final outcome for lead release that was even worse than for a full lead pipe. Increased lead release was especially evident at higher flow rates. Orthophosphate reduced lead release from full lead pipes by 64%. For partially replaced samples with copper, lead concentrations were unchanged by phosphate dosing at moderate flow (103 ± 265 vs 169 ± 349 μg/L) and were increased to very high levels when sampled at high flow rates (1001 ± 1808 vs 257 ± 224 μg/L). The increase lead release was in the form of particulate lead (>90%). In comparison to the condition without treatment, increased sulfate treatment had little impact on lead release from 100%-Pb rigs but reduced lead release from partially replaced lead pipes with copper. Our results also raise questions concerning protocols based on short 30 min stagnation (as those used in Canada) due to their incapacity to consider particulate lead release generated mostly after longer stagnation.

218Highlights► Flow-through pilot built from harvested lead pipes conditioned during a year. ► Orthophosphate treatment reduced Pb release from full Pb pipes by 64%. ► After partial LSL replacement, OrthoP was detrimental at high flow. ► After 3 months, sulfate completely eliminated the impact of partial LSL replacement. ► Higher fraction of particulate Pb was observed following 16 h vs 30 min stagnation.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Water Research - Volume 47, Issue 2, 1 February 2013, Pages 661-671
نویسندگان
, , , , , ,