کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
8051483 1519373 2018 23 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Robust supply chain network design with multi-products for a company in the food sector
ترجمه فارسی عنوان
طراحی شبکه زنجیره تامین با چند محصول برای یک شرکت در بخش مواد غذایی
کلمات کلیدی
طراحی شبکه زنجیره تامین، برنامه ریزی خطی مختلط عدد صحیح، عدم قطعیت تقاضا، بهینه سازی قوی، محل تخصیص تسهیلات،
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مکانیک محاسباتی
چکیده انگلیسی
The paper aims to solve a problem faced by a company competing in the snacks market in Turkey. In line with the growth in this market, the company needs to make important decisions over the next few years about the timing and location of a new plant, its initial capacity, the timing and amount of additional capacity to be installed at the new and existing plants, the assignment of demand points to plants and the amount of raw materials to be shipped from suppliers to the plants in each period. The objective is to minimize the total cost of various components. The problem is formulated as a multi-period supply chain network design model with multi products. The resulting mixed-integer linear programming model is solved by the commercial solver CPLEX. This model enables us to carry out all analyses requested by the company in an efficient way. After this deterministic model is solved on the basis of a 9% annual increase in demand, it is extended to a minimax regret model to deal with uncertainty in demand quantities. The results suggest that opening the new plant in the city of Ä°zmir is indeed a robust solution that is unaffected in different scenarios that are based on three distinct demand increase rates. Even though the location of the new plant remains unchanged with respect to scenarios, the optimal robust solution differs from the optimal solution of each scenario in terms of the capacity expansion decisions. After all obtained results had been communicated to the company managers and executives, the new plant construction was started in 2016 very close to the city that the mathematical model had determined. The new plant is expected to start operating in 2018.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematical Modelling - Volume 60, August 2018, Pages 526-539
نویسندگان
, ,