کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
8906254 1634095 2018 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Simulations of wind erosion along the Qinghai-Tibet Railway in north-central Tibet
ترجمه فارسی عنوان
شبیه سازی فرسایش باد در امتداد راه آهن چینگهای-تبت در شمال و مرکز تبت
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات علم هواشناسی
چکیده انگلیسی
Wind erosion along the Qinghai-Tibet Railway causes sand hazard and poses threats to the safety of trains and passengers. A coupled land-surface erosion model (Noah-MPWE) was developed to simulate the wind erosion along the railway. Comparison with the data from the 137Cs isotope analysis shows that this coupled model could simulate the mean erosion amount reasonably. The coupled model was then applied to eight sites along the railway to investigate the wind-erosion distribution and variations from 1979 to 2012. Factors affecting wind erosion spatially and temporally were assessed as well. Majority wind erosion occurs in the non-monsoon season from December to April of the next year except for the site located in desert. The region between Wudaoliang and Tanggula has higher wind erosion occurrences and soil lose amount because of higher frequency of strong wind and relatively lower soil moisture than other sites. Inter-annually, all sites present a significant decreasing trend of annual soil loss with an average rate of −0.18 kg m−2 a−1 in 1979-2012. Decreased frequency of strong wind, increased precipitation and soil moisture contribute to the reduction of wind erosion in 1979-2012. Snow cover duration and vegetation coverage also have great impact on the occurrence of wind erosion.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Aeolian Research - Volume 32, June 2018, Pages 192-201
نویسندگان
, , , , ,