کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1058266 947115 2008 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Performance of an overland flow system for advanced treatment of wastewater plant effluent
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
پیش نمایش صفحه اول مقاله
Performance of an overland flow system for advanced treatment of wastewater plant effluent
چکیده انگلیسی

Overland flow (OF) systems were evaluated and compared for advanced treatment of municipal and industrial effluents, including nutrients and nondegradable chemical oxygen demand (COD) removal. Three pilot plants were constructed at the Shahin Shahr Wastewater Treatment Plant (WWTP), Isfahan, Iran. Each pilot was assigned a specific wastewater and all were simultaneously operated for 8 months. Treatment of primary effluent, activated sludge secondary effluent, and lagoon effluent of textile wastewater was investigated at application rates (ARs) of 0.15, 0.25, and 0.35 m3 m−1 h−1. During 5 months of stable operation after a 3-month acclimation period, mean removals of total 5-day biochemical oxygen demand (TBOD5), total COD (TCOD), total suspended solids (TSS), total nitrogen (TN), total phosphorus (TP) and turbidity were 74.5%, 54.8%, 66.2%, 39.4%, 35.8%, and 67.7% for primary effluent; 52.9%, 52.9%, 66.5%, 44.4%, 39.8%, and 50.1% for activated sludge effluent; 65.7%, 58.7%, 70.3%, 41.7%, 41.3%, and 54.9% for textile wastewater lagoon effluent, respectively. The model of Smith and Schroeder, 1985. Field studies of the overland flow process for the treatment of raw and primary treated municipal wastewater. Journal of Water Pollution Control Federation 57, 785–794] was satisfactory for TBOD5. For all treatment parameters a standard first-order removal model was inadequate to represent the data but a modified first-order model provided a satisfactory fit to the data. Based on the results of this study, it can be concluded that an OF system as advanced treatment had the ability to meet effluent discharge permit limits and was an economical replacement for stabilization ponds and mechanical treatment options.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Environmental Management - Volume 88, Issue 4, September 2008, Pages 688–696
نویسندگان
, ,