Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
پیش نمایش صفحه اول مقاله
Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station
چکیده انگلیسی

According to site-specific environments such as high water pressures, high in-situ stresses and strong rockbursts, the design scheme of the long and deep diversion tunnels at Jinping II hydropower station was optimized to ensure construction safety. New drainage tunnels were considered. Furthermore, lining structures and grouting pressures were modified during the excavation of tunnels. The construction scheme was updated dynamically based on the complex geological conditions. For instances, the diversion tunnels were first excavated by drilling and blasting method at the first stage of construction, and then by the combination method of tunnel boring machine (TBM) and drilling and blasting, and finally by drilling and blasting method. Through optimized scheme and updated construction scheme, the excavation of diversion tunnel #1 was successfully completed in June, 2011. This paper summarizes the key issues in rock mechanics associated with the construction of the long and deep diversion tunnels at Jinping II hydropower station. The experiences of design and construction obtained from this project could provide reference to similar projects.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Rock Mechanics and Geotechnical Engineering - Volume 3, Issue 4, 25 December 2011, Pages 314–328
نویسندگان
, ,