کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4743119 1641778 2016 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Simulation of geologic uncertainty using coupled Markov chain
ترجمه فارسی عنوان
شبیه سازی عدم قطعیت زمین شناسی با استفاده از زنجیره مارکوف
کلمات کلیدی
عدم قطعیت زمین شناسی، زنجیره ی مارکوف همراه است، برآورد ماتریس احتمالی افقی
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
چکیده انگلیسی


• Borehole data are collected to verify the first-order Markovian property.
• A new method is proposed to estimate the HTPM of coupled Markov chain.
• The effectiveness of the proposed method for HTPM estimation is evaluated.
• The sensitivity of the estimated HTPM to borehole layout scheme is analyzed.

Geological uncertainty appears in the form of one soil layer embedded in another or the inclusion of pockets of different soil type within a more uniform soil mass. An efficient coupled Markov chain (CMC) model has been proposed to simulate geological uncertainty in the past. This model, however, cannot be directly applied to geotechnical engineering. The primary problem lies in the estimation of horizontal transition probability matrix (HTPM), one key input of the CMC model. The HTPM is difficult to estimate due to the wide spacing between boreholes in the horizontal direction. Hence, a practical method for estimating the HTPM is proposed based on borehole data. The effectiveness of this method can be evaluated using the following approach. Several virtual borehole outcomes are simulated using artificial HTPM. The HTPM estimated from the virtual boreholes is compared with the artificial HTPM. Boreholes collected from Perth, Australian are adopted to illustrate the proposed method for HTPM estimation. The results show that the estimated HTPM agrees well with the artificial HTPM if the artificial (real) HTPM or vertical transition probability matrix (VTPM) is strongly diagonally dominant (diagonal element is larger than the sum of off-diagonal elements). The estimated HTPM is not sensitive to the borehole layout scheme as the diagonal dominancy of the HTPM is strong.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Engineering Geology - Volume 207, 3 June 2016, Pages 129–140
نویسندگان
, , , , ,