کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5787696 1641769 2017 23 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Decision Plots for preliminary design of single-shield TBMs
ترجمه فارسی عنوان
طرح های تصمیم گیری برای طراحی اولیه تبرید تک سپر
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
چکیده انگلیسی
In this note a procedure for a back-of-the-envelope estimation of the correct length of a single-shielded TBM is reported in the context of a TBM preliminary design phase. It is based on four Decision Plots (DPs) and some associated equations, whose input data are the isotropic in-situ stress, the rock mechanical parameters, the maximum tolerated over-excavation and the shield skin friction coefficient. The essential output is the friction force the machine must overcome (the required thrust force), that can be compared with the available thrust force. The derivation of the DPs is illustrated and their practical use shown. Although the procedure involves some simplifying approximations, its performance is confirmed through two application examples and a comparison with the results obtained using design monograms of other authors.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Engineering Geology - Volume 216, 12 January 2017, Pages 134-139
نویسندگان
, ,