کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
4744802 | 1641891 | 2008 | 9 صفحه PDF | دانلود رایگان |
This paper presents the results of ground vibration analysis induced by blasting during the construction of the Istanbul Kadıköy–Kartal metro tunnel. Different rock formations in this tunnel route were encountered during the excavation with blasting. As a first stage, the test site is divided into 6 main regions with respect to lithology changes in the rock units and Hoek's Geological Strength Index value of these rock units. During the excavation, a total of 659 events were recorded in 260 shots by vibration monitors. Scaled distance and peak particle velocity data pairs belonging to these shots were carefully recorded and analyzed statistically. As a result of this analysis, empirical relationships between scaled distance and peak particle velocity were established with higher correlation coefficients specific to each region. Finally, the particle velocities and frequency values of all blast events were evaluated according to Turkish Environmental Regulation, the United States Bureau of Mines (USBM) and the German DIN 4150 Norms in order to predict the influence level to the neighboring buildings and structures.
Journal: Engineering Geology - Volume 100, Issues 1–2, 27 June 2008, Pages 82–90