Seepage problems in the right abutment of the Shahid Abbaspour dam, southern Iran
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات مهندسی ژئوتکنیک و زمین شناسی مهندسی
پیش نمایش صفحه اول مقاله
Seepage problems in the right abutment of the Shahid Abbaspour dam, southern Iran
چکیده انگلیسی
The basic foundation treatment of the dam consisted of consolidation grouting, a high-pressure grout curtain and a drainage curtain. Moreover, a 144 m high and 30 m wide concrete cutoff wall was built to prevent reservoir seepage through a clay-filled fracture zone in the right abutment. The grout curtain penetrates the “Principal Vuggy Zone” only beneath the central portion of the dam and below the cutoff wall. In the right abutment fan curtains were constructed to reduce drainage flows, but the seepage problem could not be solved. In order to determine the seepage direction and karstification pattern, hydrogeological studies have been carried out. Additional investigation boreholes have been drilled to monitor fluctuations in groundwater level. Besides these, water chemistry, dye tracer, pinhole and XRF tests have been carried out. As a result of these studies, seepage paths have been identified in the karstic limestone in the right abutment of the dam.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Engineering Geology - Volume 82, Issue 2, 12 December 2005, Pages 119-126